MDPL’s Advocacy Committee is reviewing the following projects on the upcoming Historic Preservation Board agenda. Here is a sneak peak of the projects to be heard, as well as links to learn more. Have a comment about a project that you would like to share with our committee? Contact us.
To review the Historic Preservation Board Agenda, including public participation information: Click Here
- 4000 Collins Avenue
- 7418 Harding Avenue
- 1620 Pennsylvania Avenue
- 337 20th Street
- 251 Washington Avenue
Discussion Items
- 1525 Lenox Avenue – Miami-Dade County Unsafe Structures orders
- Traymore Hotel, 2445 Collins Avenue – building permit update
- AIPP projects located within historic districts
- 3621 Collins Av – SMC2022-02127, quarterly update
CONTINUED ITEMS
HPB22-0551, 4000 Collins Avenue
Current Site
Proposed Structure
Click to view the full City of Miami Beach Staff Report
An application has been filed requesting a Certificate of Appropriateness for the construction of a partial 1-story rooftop addition and active roof deck.
MODIFICATIONS TO PREVIOUSLY APPROVED BOARD ORDER
HPB21-0498, 7418 Harding Avenue
Current Site
Proposed Structure
Click to view the full City of Miami Beach Staff Report
An application has been filed requesting modifications to a previously issued Certificate of Appropriateness for the partial demolition, renovation, and restoration of three buildings as part of a new hotel development on the site including a variance from the minimum hotel unit size. Specifically, the applicant is requesting additional modifications to the courtyard facades of the north and south buildings.
NEW APPLICATIONS
HPB22-0533, 1620 Pennsylvania Avenue
Current Site
Proposed Structure
Click to view the full City of Miami Beach Staff Report
An application has been filed requesting a variance from the required setback for air conditioning equipment.
HPB22-0554, 337 20th Street
Current Site
Proposed Structure
Click to view the full City of Miami Beach Staff Report
An application has been filed requesting a Certificate of Appropriateness for the partial demolition, renovation and restoration of the existing building including the introduction of a rooftop pool and decks.
HPB22-0557, 251 Washington Avenue
Current Site
Proposed Structure
Click to view the full City of Miami Beach Staff Report
An application has been filed requesting variances from the required setbacks for mechanical equipment rooms, plumbing equipment, electrical equipment, signage and a flagpole and variances from the maximum area and height of a monument sign.